Enbridge Gas has hired a third-party contractor to undertake a route analysis study to construct a 20 km long pipeline between Enbridge Gas’ Dawn-Parkway Line at Watford Station (located in the Municipality of Brooke-Alvinston) and Warwick Township.
As part of Enbridge’s Public Awareness Program, three possible locations for a “Battery Storage Project” have been identified in St Clair Township for Enbridge’s Renewable Power group.